Extreme Networks Altitude 3510 Guía de instalación Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 46
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Altitude 3510 Access Point Installation Guide 19
5 Verify the behavior of the AP3510 LEDs. For more information, see “LED Indicators
on page 23.
6 Align the bottom of the ceiling T-bar with the back of the AP3510.
7 Orient the AP3510 chassis by its length and the length of the ceiling T-bar.
8 Rotate the AP3510 chassis 45 degrees clockwise, or about 10 o’clock.
CAUTION
Push the back of the AP3510 chassis on to the bottom of the ceiling T-bar.
CAUTION
Ensure the safety wire and cabling used in the T-Bar AP3510 installation is securely fastened
to the building structure in order to provide a safe operating environment.
9 Rotate the AP3510 chassis 45 degrees counter-clockwise. The clips click as they
fasten to the T-bar.
10 The AP3510 is ready to configure. For information on basic AP3510 device
configuration, see “Basic AP3510 Configuration” on page 25.
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 45 46

Comentarios a estos manuales

Sin comentarios